Streambank Stabilization
Arlington, Texas
JEA HydroTech was part of the team providing Design-Build services for stabilizing 1,000 feet of an eroded streambank in North Arlington (Tributary WFA-1 to the Trinity River). Methods involved bio-technical stabilization measures and reinforced earth technology. Scope of services included determining the creek’s hydraulic characteristics; backwater and floodplain modeling; attaining required 404 permitting; designing and specifying stabilization processes; and, providing construction oversight responsibilities. Related services involved delineating easement boundaries, attaining necessary topography, and providing records of final construction drawings.
![](images/thumb/Streambank_1.png)